Upcoming Events

Dublin | History and Heritage

no events match your query!

New Events

Dublin

no events posted in last week

Blog Feeds

Anti-Empire

Anti-Empire

offsite link North Korea Increases Aid to Russia, Mos... Tue Nov 19, 2024 12:29 | Marko Marjanovi?

offsite link Trump Assembles a War Cabinet Sat Nov 16, 2024 10:29 | Marko Marjanovi?

offsite link Slavgrinder Ramps Up Into Overdrive Tue Nov 12, 2024 10:29 | Marko Marjanovi?

offsite link ?Existential? Culling to Continue on Com... Mon Nov 11, 2024 10:28 | Marko Marjanovi?

offsite link US to Deploy Military Contractors to Ukr... Sun Nov 10, 2024 02:37 | Field Empty

Anti-Empire >>

Lockdown Skeptics

The Daily Sceptic

offsite link National Trust Puts Vegan Tampons in Men?s Toilets Fri Oct 10, 2025 17:28 | Will Jones
The National Trust is under fire for putting vegan tampons in men's lavatories, dispensing them from a large box fixed to the wall near the urinals with the message: "Got a period situation going on? We got you."
The post National Trust Puts Vegan Tampons in Men’s Toilets appeared first on The Daily Sceptic.

offsite link BREAKING: Hamit Coskun?s Conviction for Burning Quran Overturned by Crown Court Fri Oct 10, 2025 14:13 | Will Jones
Hamit Coskun's criminal conviction for burning a copy of the Quran while shouting "f*** Islam" in a protest outside the Turkish consulate in London has been overturned by the Crown Court in a victory for free speech.
The post BREAKING: Hamit Coskun’s Conviction for Burning Quran Overturned by Crown Court appeared first on The Daily Sceptic.

offsite link It?s Time to Make Judges Accountable Again Fri Oct 10, 2025 13:26 | Dr David McGrogan
Nearly 80% of Britain's 'Establishment' is Left-wing. No wonder our 'independent' judges keep making lunatic decisions. It's time they were made accountable to voters once again, says Dr David McGrogan.
The post It’s Time to Make Judges Accountable Again appeared first on The Daily Sceptic.

offsite link Donald Trump Snubbed for Nobel Peace Prize Despite Bringing Peace to the Middle East Fri Oct 10, 2025 11:00 | Will Jones
Donald Trump was today snubbed by Nobel Peace Prize judges ? who instead awarded the prize to a Venezuelan politician ? despite the President bringing peace to the Middle East.
The post Donald Trump Snubbed for Nobel Peace Prize Despite Bringing Peace to the Middle East appeared first on The Daily Sceptic.

offsite link The Technocrats Are Falling as Their Ideology Fails Fri Oct 10, 2025 09:00 | Tilak Doshi
The technocrats are falling across the West as their ideology founders on reality. The cracking of the Net Zero consensus, like the end of Lysenkoism in the Soviet Union, is a moment of hope, says Dr Tilak Doshi.
The post The Technocrats Are Falling as Their Ideology Fails appeared first on The Daily Sceptic.

Lockdown Skeptics >>

Voltaire Network
Voltaire, international edition

offsite link Will intergovernmental institutions withstand the end of the "American Empire"?,... Sat Apr 05, 2025 07:15 | en

offsite link Voltaire, International Newsletter N?127 Sat Apr 05, 2025 06:38 | en

offsite link Disintegration of Western democracy begins in France Sat Apr 05, 2025 06:00 | en

offsite link Voltaire, International Newsletter N?126 Fri Mar 28, 2025 11:39 | en

offsite link The International Conference on Combating Anti-Semitism by Amichai Chikli and Na... Fri Mar 28, 2025 11:31 | en

Voltaire Network >>

NRA Conference @ Croke park

category dublin | history and heritage | opinion/analysis author Friday March 31, 2006 11:52author by Chris murray - TaraWatchauthor email dotliath at gmail dot comauthor address n/aauthor phone 0877765289 Report this post to the editors

Constructing a template for the EIS by Margaret Gowen, Archaeological consultant for the M3 project.

The NRA conference entitled : Building a Better Road Environment (30/03/06) was addressed by Margaret Gowen of
Gowen and co. Archaeological Consultants and project managers. The methodology of preparing an EIS used by the project management team in the M3 Route selection procedure was adapted as a template for procedural applications and re-hashed for the NRA conference. One could derive from this that it is considered a sucessful model for future road projects.

The item presented at conference was boldly entitled;
Guidelines for the Assessment of Archaeological Heritage Impacts of National Road Schemes. Or how to ensure that resolution is achieved in advance of construction. The Environmental Impact assesssment or EIS stage is crucial
because it is only then that route change is considered.
The introductory briefly covered the legislations that pertain specifically to monuments: NMA 1930-2004,the Granada convention and International Council on Monuments and Sites, (ICOMOS).

It became interesting when the criteria for route selection and the issue of mitigation were introduced.The basis for the nature, focus and presentation of the EIS were to ensure consistency during the constraint study, the route corridor selection study and the integration of findings and results.
How is a monument defined? Since there is no legislation
defining a complex as a monument , it is defined as a landscape containg monuments: recorded monuments, high visibility sites, low visibility sites and sites with no visibility and no surface expression. The legal team representing the NRA in the recent judiical review case claimed that a National Monument per se did not exsist in legislation 'unless something was to be done with it' . Margaret gowen attended the whole case and took copious notes. How does one go about the constraints study; three items were introduced at this point: Methodologies ,Desk Study , the use of records , maps and public domain information lists. The windshield survey, (a drive past) and an aerial survey. items collated from these surveys are presented as part of the constraints study.
Mitigation: ' Mitigation by avoidance where possible' this is achieved by resolution in advance of construction.
In the choice of route it is imperative to mitigate by excavation,
recording and publication of monuments. The excavation requirement assessment to be achieved well in advance of construction.All collated informations will be fed into the EIS for publication. procedures include the team deciding on the scope of the archeological heritage survey .
Communications between the project managers should be initated with NM section of the dept of environment at the route corridor selection stage. Communications should be initiated with the statutory agencies at the EIS stage.
There you have it,how to stich up the Route selection and EIs process. reference was made to the Code of Practice which is a non-statutory implement and therefore in this published document easily transcended.
The document was preceeded by a disclaimer;

While every care has been taken to ensure that the content of this document is useful and accurate, the NRA and any contributing party shall have no legal responsibility for the content or accuracy of the information so provided or for any loss ........ thank you to Ed for offering me the recently vacated seat of Mr Cullen and facilitating the writing of this article.
It is evident that there is no Code of Practice covering the issues published in these articles and legislation does not protect our archaeological heritage.

author by c murray - TaraWatchpublication date Fri Mar 31, 2006 12:23author email dotliath at gmail dot comauthor address n/aauthor phone 0877765289Report this post to the editors


Environmental Asssessment and Construction Guidelines
NRA: The National Roads Authority
St Martin's House
Waterloo Road
Dublin 4

Email: info@nra.ie

www.nra.ie

Related Link: http://www.nra.ie
 
© 2001-2025 Independent Media Centre Ireland. Unless otherwise stated by the author, all content is free for non-commercial reuse, reprint, and rebroadcast, on the net and elsewhere. Opinions are those of the contributors and are not necessarily endorsed by Independent Media Centre Ireland. Disclaimer | Privacy